References | Laboratories of Soil Mechanics

Participation in the projects carried out by other departments of the Company

ContractClientYear(s)
I/27 Kaznějov, bypass, a detailed geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2020
I/26 D5 Stod, přeložka - a detailed geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2020
D1 01191.A MÚK Brno South,a detailed geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2019 – 2020
I/57 Val. Meziříčí - Jarcová, bypass, a detailed geotechnical surey Road and Motorway Directorate of the Czech Republic (RMD of the CR)2019 – 2020
I/55 Břeclav – bypass, a supplementary geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2019 – 2020
I/39 Horní Planá - a supplementary geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2018 – 2019
D52 Brno – Southern Tangent, a geotechnical surveyRoad and Motorway Directorate of the Czech Republic (RMD of the CR)2018 – 2019
D1 – a detailed geotechnical survey of the widening of the motorway around Brna to six lanesRMD of the CR2017 – 2018
D52 Nové Mlýny – Bavory, Mikulov South – the state border, a supplementary geotechnical surveyRMD of the CR2017 – 2018
I/53 Branišovice – Pohořelice, a detailed geotechnical surveyRMD of the CR2017 – 2018
I/38 Znojmo - Bypass I, a detailed geotechnical surveyRMD of the CR2016 – 2017
R35 Časy – Ostrov, a geotechnical surveyRMD of the CR2015 – 2016
I/45 Nové Heřmanovy – Zátor, 1st stage, a detailed geotechnical surveyRMD of the CR2016