Environmental protection and remediation services,
hydrogeology and geological engineering

Drinking-water supply - water-deficient areas, Mongolia

Project: Delivery of Water-System Equipment for the Areas Lacking Drinking Water in Mongolia

The project was assigned by the contractor, the Czech Republic - the Ministry of Industry and Trade, to the company GEOtest Brno, a.s. by the "Decision on Awarding the Public Contract of 18.7.2006" and is in compliance with the bilateral interest of the development of mutual relations between the Czech Republic and Mongolia, with the conclusions of the meeting of the Czech - Mongolian Mixed Committee and with the negotiation of both of the parties.

Map of Mongolia

For the Czech party, the Administrator's site is The Ministry of Industry and Trade of the Czech Republic; for the Mongolian party, it is the Ministry for Construction and Urban Development of Mongolia. For the Czech party, the implementing coordinator is GEOtest Brno, a.s.; for Mongolian party, it is the company Mongolgeotest, Co., Ltd. in Ulaanbaatar.


Basic goals of the project:

Year 2006

A work implementation project was prepared on the basis of discussions held in Mongolia with administration authorities and interested organisations and also according to the methodical findings acquired during the documentation of water sources in the selected somons of Tov, Dundgovi and Omnogovi Aimaks. An annual report and an interim report were prepared.

Year 2007

The documentation of water sources will continue in the selected somons in the west and east of Mongolia. Water treatment technologies will be installed on selected water sources according to the work implementation project and after consultations with the Mongolian party.

Year 2008

The documentation of water sources will be completed. After the evaluation of the results of field investigations and after the multicriterial analyses of the individual somons, it will be decided on the installation of water treatment technologies or the drilling of new hydrogeological wells.

Year 2009

The installation of water treatment technologies at the selected sites. The completion of drilling work. Building work will be carried out on new structures and the existing structures will be insulated externally.

Year 2010

The completion of the installation of water treatment technologies and pumping equipment and the completion of construction work. A final presentation of the project of foreign cooperation will be held.


larger picture

President V. Klaus meets
Mongolian graduates
from Czechoslovak schools

larger picture

Documentation of a water source
in the desert town of
Dalanzadgadu in southern Gobi

larger picture

Interview of TV Prima with
Ing. Bayar, Director of the
company Mongolgeotest


larger picture

The struggle for water in the wind
in the somon of Bulgan
(Omnogobi Aimak)

larger picture

The only functional water source
in the somon of Delgertsogt
is 2 km away from settlement

larger picture

Outflow of water from
conglomerate rocks
by the somon of Bulgan


larger picture

Drilling of a new water source
in the Sum of Bayanmonh
(Hentiy Aymag)

larger picture

Water treatment plants
left: G 900, GEOtest Brno,
right: IWET Brno

larger picture

Working on the installation of
a water treatment plant in a new
object (Dundgovi Aymag)


larger picture

A water source in the Sum of
Bayanjargalan, Dundgovi Aymag
before its rehabilitation

larger picture

Delivery of a water treatment
plant in the Sum of Olziyt
(Dundgovi Aymag)

larger picture

A water source in the Sum of
Bayanjargalan after
the installation of a water
treatment plant in a new object



GEOtest Brno, a.s., Smahova 112, 659 01 Brno tel.: 548 125 111*, 548 125 308, fax: 545 217 979, e-mail: trade@geotest.cz